{"id":14683,"date":"2025-11-07T15:17:36","date_gmt":"2025-11-07T15:17:36","guid":{"rendered":"https:\/\/startgreen.nl\/energiefonds-overijssel-achieves-strong-results-in-the-first-half-of-2025\/"},"modified":"2025-11-07T15:17:36","modified_gmt":"2025-11-07T15:17:36","slug":"energiefonds-overijssel-achieves-strong-results-in-the-first-half-of-2025","status":"publish","type":"post","link":"https:\/\/startgreen.nl\/en\/energiefonds-overijssel-achieves-strong-results-in-the-first-half-of-2025\/","title":{"rendered":"Energiefonds Overijssel achieves strong results in the first half of 2025"},"content":{"rendered":"<p><strong>In the first half of 2025, Energiefonds Overijssel \u2013 one of the funds managed by StartGreen Capital \u2013 has once again demonstrated how sustainable investments create tangible impact for the province, entrepreneurs, and residents.<\/strong><\/p>\n<p style=\"font-weight: 400;\">With a portfolio of \u20ac297 million, the fund invests in energy conservation, renewable generation, circular projects, and energy infrastructure.<\/p>\n<p style=\"font-weight: 400;\"><strong>The impact results speak for themselves:<\/strong><\/p>\n<ul>\n<li style=\"font-weight: 400;\">In the first half of 2025, <span style=\"text-decoration: underline;\">\u20ac19 million in new financing was provided<\/span> (total since the fund&#8217;s inception: \u20ac417 million, spread across 218 financings).<\/li>\n<li style=\"font-weight: 400;\"><span style=\"text-decoration: underline;\">Avoided CO\u2082 emissions (so far in 2025): 19,358 tons<\/span> (expected total CO\u2082 reduction: 407,003 tons)<\/li>\n<li style=\"font-weight: 400;\">Funded projects <span style=\"text-decoration: underline;\">meet the energy consumption needs of more than 184,000 households<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"text-decoration: underline;\">Nearly 2,400 temporary and 212 structural jobs<\/span> have been created or retained.<\/li>\n<\/ul>\n<p><strong>Building a sustainable, future-proof Overijssel together.<br \/>\n<\/strong>With 53 projects in the pipeline, and a clear focus on sectors that contribute to a sustainable and future-proof province, Energiefonds Overijssel continues to work hard on building a cleaner, smarter, and stronger Overijssel.<\/p>\n<p><strong>More information:<\/strong><\/p>\n<ul>\n<li>Read <a href=\"https:\/\/www.energiefondsoverijssel.nl\/nieuws\/duurzame-impact-en-economische-groei-in-eerste-half-jaar-2025-in-overijssel\/\" target=\"_blank\" rel=\"noopener\">the full semi-annual report<\/a> on the Energiefonds Overijssel website.<\/li>\n<li>Want to know more about Energiefonds Overijssel? View <a href=\"https:\/\/startgreen.nl\/fondsen\/energiefonds-overijssel\/\">the fund page<\/a>. <\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-7935\" src=\"https:\/\/www.startgreen.nl\/wp-content\/uploads\/2025\/11\/Energiefonds-Overijssel_Halfjaar-impact-resultaten_2025-300x199.jpeg\" alt=\"\" width=\"710\" height=\"471\" srcset=\"https:\/\/startgreen.nl\/wp-content\/uploads\/2025\/11\/Energiefonds-Overijssel_Halfjaar-impact-resultaten_2025-300x199.jpeg 300w, https:\/\/startgreen.nl\/wp-content\/uploads\/2025\/11\/Energiefonds-Overijssel_Halfjaar-impact-resultaten_2025-1024x679.jpeg 1024w, https:\/\/startgreen.nl\/wp-content\/uploads\/2025\/11\/Energiefonds-Overijssel_Halfjaar-impact-resultaten_2025-768x509.jpeg 768w, https:\/\/startgreen.nl\/wp-content\/uploads\/2025\/11\/Energiefonds-Overijssel_Halfjaar-impact-resultaten_2025-1536x1018.jpeg 1536w, https:\/\/startgreen.nl\/wp-content\/uploads\/2025\/11\/Energiefonds-Overijssel_Halfjaar-impact-resultaten_2025.jpeg 2048w\" sizes=\"auto, (max-width: 710px) 100vw, 710px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In the first half of 2025, Energiefonds Overijssel \u2013 one of the funds managed by StartGreen Capital \u2013 has once again demonstrated how sustainable investments create tangible impact for the province, entrepreneurs, and residents. With a portfolio of \u20ac297 million, the fund invests in energy conservation, renewable generation, circular projects, and energy infrastructure. The impact [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":14686,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[123,122,121],"tags":[128,127,126,125,134,124],"class_list":["post-14683","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energiefonds-overijssel","category-energy-fund-overijssel","category-news","tag-energiefonds-overijssel","tag-energy-transition","tag-impact-investing","tag-overijssel","tag-renewable-energy","tag-sustainability"],"acf":[],"_links":{"self":[{"href":"https:\/\/startgreen.nl\/en\/wp-json\/wp\/v2\/posts\/14683","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/startgreen.nl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/startgreen.nl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/startgreen.nl\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/startgreen.nl\/en\/wp-json\/wp\/v2\/comments?post=14683"}],"version-history":[{"count":0,"href":"https:\/\/startgreen.nl\/en\/wp-json\/wp\/v2\/posts\/14683\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/startgreen.nl\/en\/wp-json\/wp\/v2\/media\/14686"}],"wp:attachment":[{"href":"https:\/\/startgreen.nl\/en\/wp-json\/wp\/v2\/media?parent=14683"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/startgreen.nl\/en\/wp-json\/wp\/v2\/categories?post=14683"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/startgreen.nl\/en\/wp-json\/wp\/v2\/tags?post=14683"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}