{"id":14696,"date":"2026-07-22T15:19:38","date_gmt":"2026-07-22T15:19:38","guid":{"rendered":"https:\/\/startgreen.nl\/wind-energy-what-is-still-possible\/"},"modified":"2026-07-22T15:19:38","modified_gmt":"2026-07-22T15:19:38","slug":"wind-energy-what-is-still-possible","status":"publish","type":"post","link":"https:\/\/startgreen.nl\/en\/wind-energy-what-is-still-possible\/","title":{"rendered":"Wind energy: what is still possible?"},"content":{"rendered":"<p><span style=\"color: #2acc9d;\">Deep Dive, by Jakoba van der Mei &#8211;<\/span><\/p>\n<p style=\"font-weight: 400;\"><strong>Sustainable energy generated by wind turbines long seemed to be the holy grail for the energy transition. However, due to negative prices, decreasing subsidies, and limited placement options, growth has come to a standstill. Jakoba van der Mei, Investment Director of the ASN Energie &#038; Innovatiefonds, explains where generation and investment opportunities still lie.  <\/strong><\/p>\n<p style=\"font-weight: 400;\">The number of wind projects has been stagnating for years. As you can see in the table below, the number of megawatts developed has been decreasing since 2021. Consequently, megawatt peak capacity is stagnating just below 7 gigawatts. Below the table, Jakoba explains why this is the case.   <\/p>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_14522\" aria-describedby=\"caption-attachment-14522\" style=\"width: 716px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/startgreen.nl\/wp-content\/uploads\/2026\/07\/Ontwikkeling-van-het-vermogen-van-windenergie-op-land-2025.svg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-14522\" src=\"https:\/\/startgreen.nl\/wp-content\/uploads\/2026\/07\/Ontwikkeling-van-het-vermogen-van-windenergie-op-land-2025.svg\" alt=\"\" width=\"716\" height=\"411\"><\/a><figcaption id=\"caption-attachment-14522\" class=\"wp-caption-text\"><span style=\"font-size: 12px; vertical-align: super; font-family: var(--font-sans);\">Source: RVO &#8216;Onshore Wind&#8217; Monitor<\/span><\/figcaption><\/figure>\n<p><strong>Causes of stagnation<\/strong><\/p>\n<p><span style=\"text-decoration: underline;\">Limited space<\/span><br \/>\n\u201cThis has to do with the number of available locations. But regulations regarding the distance to residential homes and legally permitted noise standards also play a major role here,\u201d Jakoba explains. \u201cFor example, the new standards for wind turbines resulting from the <a href=\"https:\/\/www.helpdeskwindopland.nl\/themas\/milieunormering+windturbines\/nevele-arrest+en+de+gevolgen+voor+windparken\/default.aspx\" target=\"_blank\" rel=\"noopener\">Nevele ruling (2021)<\/a> will come into effect on January 1, 2027. There is still plenty of space at sea*, but those are usually very large projects that currently fall outside our scope.\u201d  <\/p>\n<p style=\"font-weight: 400;\">*See: <a href=\"https:\/\/www.rijksoverheid.nl\/onderwerpen\/duurzame-energie\/windenergie-op-zee\" target=\"_blank\" rel=\"noopener\">Offshore wind energy &#8211; Central Government<\/a><\/p>\n<p><span style=\"text-decoration: underline;\">SDE subsidy is decreasing<\/span><br \/>\n\u201cIt is primarily market developments that are standing in the way of the development of new wind farms,\u201d Jakoba notes. \u201cThe government has significantly cut <a href=\"https:\/\/www.rvo.nl\/subsidies-financiering\/sde\" target=\"_blank\" rel=\"noopener\">SDE subsidies<\/a>: the subsidies from the Sustainable Energy Production and Climate Transition Incentive. Previously, you received a subsidy for every megawatt you supplied to the grid, regardless of the price. This has changed since 2016: if prices are negative for longer than a certain period, you no longer receive compensation from the subsidy. That period is becoming increasingly shorter; now it is already one hour.\u201d    <\/p>\n<p><span style=\"text-decoration: underline;\">Grid congestion<\/span><strong><br \/>\n<\/strong>These negative prices are the result of the imbalance between supply and demand, as you can read in Joost Vlot&#8217;s blog: <a href=\"https:\/\/startgreen.nl\/startgreen-ziet-kansen-in-de-netcongestie\/\" target=\"_blank\" rel=\"noopener\">StartGreen sees opportunities in grid congestion<\/a>. Jakoba: \u201cYou can compare it to the butter mountain. In the 1960s, a massive surplus of produced butter was created as a direct result of production subsidies for agriculture. The government also does not want to subsidize production during (prolonged) negative market prices now. But once a turbine is in place, the production costs of wind energy are relatively low, so it is a waste if you have to turn off a solar or wind farm.\u201d <\/p>\n<figure id=\"attachment_132\" aria-describedby=\"caption-attachment-132\" style=\"width: 733px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-132\" src=\"https:\/\/startgreen.nl\/wp-content\/uploads\/2025\/03\/Jakoba-van-der-Mei-1-300x300.jpg\" alt=\"Jakoba van der Mei\" width=\"733\" height=\"733\" srcset=\"https:\/\/startgreen.nl\/wp-content\/uploads\/2025\/03\/Jakoba-van-der-Mei-1-300x300.jpg 300w, https:\/\/startgreen.nl\/wp-content\/uploads\/2025\/03\/Jakoba-van-der-Mei-1-150x150.jpg 150w, https:\/\/startgreen.nl\/wp-content\/uploads\/2025\/03\/Jakoba-van-der-Mei-1-768x768.jpg 768w, https:\/\/startgreen.nl\/wp-content\/uploads\/2025\/03\/Jakoba-van-der-Mei-1.jpg 800w\" sizes=\"auto, (max-width: 733px) 100vw, 733px\" \/><figcaption id=\"caption-attachment-132\" class=\"wp-caption-text\"><span style=\"font-size: 12px; vertical-align: super; font-family: var(--font-sans);\">Jakoba van der Mei, Partner StartGreen Capital &#038; Investment Director ASN Energie &#038; Innovatiefonds<\/span><\/figcaption><\/figure>\n<div class=\"block-img__simple\">\n<div class=\"image-simple\">\n<div class=\"wrapper\">\n<div class=\"block-img__simple\">\n<div class=\"image-simple\">\n<div class=\"wrapper\">\n<p><strong>How is it still possible?<br \/>\n<\/strong>To prevent being unable to discharge sustainably generated energy, developers and financiers are looking for ways to better utilize existing projects. One of these is so-called \u2018system integration\u2019: combining a wind farm with a battery, a solar farm, or a direct off-taker \u2013 or with a combination of these components. We also call this \u2018co-location\u2019.  <\/p>\n<\/div>\n<p><span style=\"text-decoration: underline;\">Wind and storage<\/span><br \/>\nWith an ESS (Electricity Storage System, also known as BESS: <em>Battery Energy Storage System<\/em>), you can store electricity for later use. This reduces peak loads and congestion and helps make the energy system stable and sustainable. This is a huge gain for the energy transition, and for that reason, <a href=\"https:\/\/startgreen.nl\/door-elektriciteit-op-te-slaan-voor-later-gebruik-verminder-je-piekbelasting-en-congestie\/\" target=\"_blank\" rel=\"noopener\">StartGreen invests in storage<\/a>.  <\/p>\n<p><em style=\"font-family: var(--font-sans); font-size: var(--h3-size); letter-spacing: -0.02em;\">Jakoba: \u201cAnd then there is another new, interesting development: from May 2026, the government will offer a new, so-called <a href=\"https:\/\/ondernemersplein.overheid.nl\/subsidies-en-regelingen\/subsidie-flexibel-elektriciteitsverbruik\/?msclkid=1f70d347094a1c608b6cbaa06f4e158b&#038;utm_source=bing&#038;utm_medium=cpc&#038;utm_campaign=3.%20DOP%20-%20DSA%20Ondermersplein%20Overheid&#038;utm_term=ondernemersplein%20overheid&#038;utm_content=DSA%20-%20Catch%20All\" target=\"_blank\" rel=\"noopener\">Flex-e subsidy<\/a> to stimulate investments in flexibility. You can apply for a subsidy for the purchase of an ESS for up to 40% of the purchase value, up to a maximum of \u20ac300,000. This significantly lowers the threshold for investing in co-location.\u201d  <\/em><\/p>\n<blockquote><p><span style=\"font-family: var(--font-sans); font-size: var(--fs-body);\">In one of our StartGreen Insights, Guus Bronkhorst describes the influence of the geopolitical situation on <\/span><em style=\"font-family: var(--font-sans); font-size: var(--fs-body);\">energy trading<\/em><span style=\"font-family: var(--font-sans); font-size: var(--fs-body);\"> via storage: <\/span><a style=\"font-family: var(--font-sans); font-size: var(--fs-body);\" href=\"https:\/\/startgreen.nl\/en\/flexibility-as-a-foundation-how-bess-protects-us-against-geopolitical-and-fossil-risks\/\" target=\"_blank\" rel=\"noopener\">Flexibility as a foundation: why BESS protects us against geopolitical and fossil risks<\/a><\/p><\/blockquote>\n<\/div>\n<\/div>\n<p style=\"font-weight: 400;\"><span style=\"text-decoration: underline;\">Wind and solar<\/span><br \/>\nAdditionally, it is interesting to see if there is a solar farm nearby. \u201cWind and solar are usually complementary,\u201d Jakoba explains. \u201cIt often blows when the sun is not shining. The sun shines more often and longer in the summer and during the day, and it blows more in the winter and at night. By combining turbines with solar panels, you can produce electricity in a more constant manner. This means higher security of supply, which can offer significant added value for (direct) local off-take.\u201d  <\/p>\n<p style=\"font-weight: 400;\"><span style=\"text-decoration: underline;\">Wind and direct off-take<\/span><strong><br \/>\n<\/strong>By phasing out the SDE as financial security, StartGreen is looking for other solutions to strengthen the income from turbines. \u201cThis can be done by developing energy hubs, such as a charging plaza next to a wind farm. Or by supplying directly to a local, often industrial party that cannot get a connection due to grid congestion. The developer of the wind farm then enters into a cPPA (<em>Corporate<\/em> <em>Power Purchase Agreement<\/em>)<strong>. <\/strong>With such an agreement, you create fixed off-take for your generated megawatts, meaning the turbine has to be shut down less often. The off-taker is guaranteed power, making expansion or connection in a congested area possible after all. A win-win(d) situation.\u201d     <\/p>\n<div class=\"block-img__simple\">\n<div class=\"image-simple\">\n<div class=\"wrapper\"><strong style=\"font-family: var(--font-sans); font-size: var(--fs-body);\">How does StartGreen invest in wind?<\/strong><\/div>\n<div class=\"wrapper\">\n<p style=\"font-weight: 400;\">Due to the developments described above, StartGreen funds currently primarily finance small-scale wind projects, often with a plan for system integration such as storage or a charging plaza.<\/p>\n<p style=\"font-weight: 400;\"><em style=\"font-family: var(--font-sans); font-size: var(--h3-size); letter-spacing: -0.02em;\">Jakoba: \u201cBecause the market is becoming increasingly complex, you need to know what you are doing. Since SDE subsidies are no longer a guarantee and market prices fluctuate, the risks in the wind market have increased considerably. Therefore, knowledge and expertise are required from the developer, the project owner, and the financier.\u201d  <\/em><\/p>\n<p><span style=\"text-decoration: underline;\">Onshore wind<\/span><br \/>\nStartGreen focuses particularly on onshore and <em>nearshore<\/em> wind: turbines in the IJsselmeer, such as at <a href=\"https:\/\/www.windparkfryslan.nl\/\" target=\"_blank\" rel=\"noopener\">Windpark Frysl\u00e2n<\/a>, which was financed with 10 million euros in citizen participation via <a href=\"https:\/\/www.invesdor.nl\/#\/\" target=\"_blank\" rel=\"noopener\">Invesdor<\/a>. Additionally, wind energy is more time- and capital-intensive than solar. Developing a wind farm easily takes 5 to 10 years, while a solar farm is usually realized within 5 years.\u201d  <\/p>\n<p style=\"font-weight: 400;\">\u201cThe initial investment costs per megawatt peak (MWp) for onshore wind are generally up to twice as high as for large-scale solar farms,\u201d Jakoba explains.<\/p>\n<p style=\"font-weight: 400;\"><em style=\"font-family: var(--font-sans); font-size: var(--h3-size); letter-spacing: -0.02em;\">\u201cO<\/em><em style=\"font-family: var(--font-sans); font-size: var(--h3-size); letter-spacing: -0.02em;\">nshore wind achieves an average of twice as many production hours as solar farms, resulting in a lower cost price per kilowatt-hour produced. Furthermore, an onshore wind turbine delivers electricity more evenly spread throughout the year, meaning the yield per installed MWp is often higher than with solar panels, which mainly produce simultaneously. As a result, despite the higher investment, onshore wind is attractive for a more stable and higher energy yield.\u201d <\/em> <\/p>\n<p><span style=\"text-decoration: underline;\">Repowering: circular use<\/span><strong><br \/>\n<\/strong>Furthermore, Jakoba sees a wave of <em>repowering<\/em> approaching. \u201cThe first turbines have now been in place for more than twenty years. We are now going to think from a circularity perspective about how we can best use existing projects for the energy transition. I see many opportunities in better utilizing existing capacity, also from a financing perspective. For example, by adding storage and thus flexibility. And some older turbines provide too little capacity: new models can already deliver much more energy. If we replace the old turbines, the land use remains the same.\u201d <\/p>\n<\/div>\n<blockquote>\n<p style=\"font-weight: 400;\"><strong>What is the level of support for wind turbines?<br \/>\n<\/strong><em>\u201cNot In My Backyard<\/em> is still very much alive,\u201d says Jakoba. \u201cAs a result, citizens sometimes decide to take development into their own hands. <em>Wij Duurzaam Staphorst<\/em> started developing Windpark Bovenwind themselves when the province of Overijssel announced its regional energy targets, under the motto &#8216;Then we&#8217;d rather do it ourselves.&#8217;\u201d <\/p>\n<p style=\"font-weight: 400;\"><strong>Technological innovations<\/strong><br \/>\nRegarding reports on adverse environmental effects: after just three to six months, the CO2 emissions from production are offset by the yield, Jakoba notes. \u201cFurthermore, there are more and more technological innovations to limit any ecological and environmental impact. For example, at Windpark Krammer and Zeewolde, there is a <a href=\"https:\/\/www.almerezaken.nl\/nieuws\/algemeen\/60893\/windpark-zeewolde-gebruikt-ai-detectiesysteem-voor-veiligheid\" target=\"_blank\" rel=\"noopener\">white-tailed eagle detection system<\/a> that ensures turbines stand still when white-tailed eagles come near. And just like with the development of a solar farm, an Environmental Impact Assessment (EIA) must be made for the development.\u201d   <\/p>\n<\/blockquote>\n<p><span style=\"text-decoration: underline;\">Investing in cooperative development<\/span><strong><br \/>\n<\/strong>StartGreen also likes to help realize local initiatives. Energiefonds Overijssel does this in Overijssel and the ASN Energie &#038; Innovatiefonds in the other provinces: together we offer national coverage. Energiefonds Overijssel has created the <a href=\"https:\/\/www.energiefondsoverijssel.nl\/leif\/\" target=\"_blank\" rel=\"noopener\">Local Energy Initiatives Facility (LEI-F)<\/a>: this allows cooperatives to finance the development of a project. \u201cThink of applying for permits and subsidies, having research reports made, and arranging agreements with the builder and grid connection. Only when all that is finalized do we step in \u2013 possibly together with a bank \u2013 to finance the construction and operation.\u201d   <\/p>\n<p><span style=\"text-decoration: underline;\">In-house<\/span><br \/>\nA great example of a cooperative project is Windpark Bovenwind. A 12.9 MWp wind farm with three turbines, which has been supplying power in the Staphorst region since 2024. <\/p>\n<p><em style=\"font-family: var(--font-sans); font-size: var(--h3-size); letter-spacing: -0.02em;\">Jakoba: \u201cWindpark Bovenwind was developed entirely in-house by the Wij Duurzaam Staphorst cooperative with support from the Drents Overijsselse Delta Water Board. The ASN Energie Innovatiefonds made this possible with a senior loan to the project. One hundred percent of the proceeds flow back to the local community. The cooperative is now investigating whether they can add an ESS to optimize the value of the generated sustainable power.<\/em><em style=\"font-family: var(--font-sans); font-size: var(--h3-size); letter-spacing: -0.02em;\">\u201d <\/em> <\/p>\n<p><span style=\"text-decoration: underline;\">New role: Facility and Security Agent<\/span><strong><br \/>\n<\/strong>Kreekraksluis is a large-scale <em>onshore<\/em> wind farm of 40 MWp with 16 turbines, which has been operational for 13 years. It was pre-financed by ASN Energie &#038; Innovatiefonds and later partially sold to Triodos. Jakoba:  <\/p>\n<p>\u201cIn these types of large projects, one of the financiers is the agent: they take the lead on behalf of the other financiers. StartGreen recently took over that role. It is the first time that we, as Facility and Security Agent, manage the securities and lead the loans on behalf of the borrowers. Although it is a new role for StartGreen, it is not new to me: I gained experience with large-scale projects at Sumitomo Mitsui Banking Corporation. We also have the systems in-house for the execution.\u201d<\/p>\n<p><span style=\"text-decoration: underline;\">Local off-takers <\/span><strong><br \/>\n<\/strong>The ASN Energie &#038; Innovatiefonds is working on the development of two wind farms with local off-takers. \u201cA wind farm in Veghel forms the basis for an energy hub consisting of a charging plaza for electric (freight) cars and a battery. In addition, we are working on financing a wind farm in Zeeland. The two turbines are intended to supply an agricultural off-taker. Both farms thus have a positive effect on grid congestion in this area.\u201d <\/p>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"wrapper\"><\/div>\n<\/div>\n<div class=\"image-simple\">\n<div class=\"wrapper\">\n<div><\/div>\n<\/div>\n<\/div>\n<\/div>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Deep Dive, by Jakoba van der Mei &#8211; Sustainable energy generated by wind turbines long seemed to be the holy grail for the energy transition. However, due to negative prices, decreasing subsidies, and limited placement options, growth has come to a standstill. Jakoba van der Mei, Investment Director of the ASN Energie &#038; Innovatiefonds, explains [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":14698,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[135,129],"tags":[127,130,133,151,132,131,126,124],"class_list":["post-14696","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","category-startgreen-capital","tag-energy-transition","tag-financing","tag-funding","tag-funding-2","tag-grid-congestion","tag-impact","tag-impact-investing","tag-sustainability"],"acf":[],"_links":{"self":[{"href":"https:\/\/startgreen.nl\/en\/wp-json\/wp\/v2\/posts\/14696","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/startgreen.nl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/startgreen.nl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/startgreen.nl\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/startgreen.nl\/en\/wp-json\/wp\/v2\/comments?post=14696"}],"version-history":[{"count":0,"href":"https:\/\/startgreen.nl\/en\/wp-json\/wp\/v2\/posts\/14696\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/startgreen.nl\/en\/wp-json\/wp\/v2\/media\/14698"}],"wp:attachment":[{"href":"https:\/\/startgreen.nl\/en\/wp-json\/wp\/v2\/media?parent=14696"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/startgreen.nl\/en\/wp-json\/wp\/v2\/categories?post=14696"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/startgreen.nl\/en\/wp-json\/wp\/v2\/tags?post=14696"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}